|
Home Page
Board of Directors
Beachwalk Calendar
Phone Numbers
Maintenance
Beachwalk Breeze
Financials
Rules &
Regulations
Insurance Highlights
CC & Rs
Architectural
Guidelines
Beachwalk Models
Photo Gallery
Forms:
Architectural
Changes
Clubhouse
Reservations
Common
Area
Usage
Landscape
Modification
Disclaimer

|
 |
BEACHWALK HOMEOWNER
ASSOCIATION
BEACHWALK FENCE SPECIFICATIONS |
|
MATERIALS:
- 4"X4" pressure treated posts
- 2"X4" pressure treated top 8c bottom rails
- 2"x2" center brace
- l"x2" top trim
- 1" x 3" (max width) fence slats
- Concrete
FENCE RELOCATION (NEW CONSTRUCTION)
- Post holes to be approx. 24” deep and, 8” in diameter & approximately 4' on center. Maximum 6’ O.C.
- Fill holes with concrete, and set post & allow to dry a minimum of 24 hours.
- Install post in level & plumb manner at the same height as adjoining fences.
- Affix top rail to the top of the post & connect to the tops of each post in turn until connected to existing fence sections.
- Affix 1x2's to the underside of the top rail, leaving appropriate space for thickness of fence slat material.
- Affix the 2x3 center brace, approx. 36" off the ground (minor adjustments may be necessary to line up the center brace with adjacent fence sections) & flush with the back edge of the post.
- Affix the inside rail in a level line with existing fence sections.
- Install the fence slats, securing them through the lx2’s at the top, to the 2x3 in the center & to the inside bottom rail. NOTE: On back fences, slats are to be spaced approx. 1/2" apart or solid with no gaps. On side fences there are no spaces between slats.
- Affix the outside bottom rail, keeping it level with the inside bottom rail.
FILL IN HALF SECTIONS:
- For each half section, measure from post to post.
- Cut 4 each lx2's (2 for the top & 2 for the bottom)
- Measure from the existing half section top rail to the fence top rail to get the length of the slats.
- Sandwich slats between lx2's top & bottom with approx. 1/2" gap and nail through.
- Nail completed sections to the top of the top rail of the existing half section & to the underside of the top fence rail.
- Paint assigned color.
|
|
|